Subway line U2 - Construction phase U2/16 – Airfield South

Project Description

Project description:
Subway line U2: km 21.991 – km 23.527
Length of section: 1.536 km
Total track length: 3.626 km

Elevated, multiple-track route on reinforced concrete bridge structures
Airfield-South station, elevated with central platform as reinforced concrete structure, two station buildings and a substation
Elevated reversing, parking and maintenance facilities: four reversing tracks, parking tracks for six long trains and maintenance tracks for two long trains, operating rooms – all structures of reinforced concrete
Elevated reversing, parking and maintenance facilities with four reversing tracks, parking tracks for six long trains and maintenance tracks for two long trains and operating rooms as reinforced concrete structures.

Client: Wiener Linien GesmbH & Co KG
Contact person: Ing. Walter Zemen
Planning, Building and Project Management
Tel: +43 1 7909-79100
walter.zemen@wienerlinien.at                                                    
Project: Subway line U2, Section 16 – Airfield South
Project area: 22nd District in Vienna
Total net costs: Approx. €95 mill.
Planning period: 2008 – 2013

Scope of works:
Traffic planning

Submission planning
Planning of routing
Relocation of facilities
Tender planning
Detailed planning

Structural/construction engineering services

Preliminary structural design
Structural design as part of the submission project, including the calculation of quantities and specifications
Execution planning, detailed statics, formwork and reinforcement plans, detailed steel construction planning